|
City: Abu Dhabi, United Arab Emirates Instruments: Piano Languages: English, Arabic and French http://www.dekkak.com
|
|
BlogDubai Wharf structure is on track Work at Dubai Wharf has started and is progressing as timetable. It was November 2014 when work has started and nearly 10% of the building of the development in Culture Village is finish, as well as facilitating and underneath works. The project is located on the banks of Dubai Creek, and the 370 hectare master plan calls for residential, commercial, and retail sections to be constructed. The centre piece of the project is Palazzo Versace Dubai. The operation of technologies utilizing perceptible Internet of Everything will be amounting to Dh17.9 billion to Dubai’s economy by 2020. Smart Dubai divulged that the visions of the Internet of Everything – recognized as net revenues, cost savings and value available to organizations and industries – amounted to Dh4.3 billion for the emirate’s public division and Dh13.6 billion for the private division. Read more: http://www.adgeco.com/approximately-dh18-billion-budget-smart-dubai/ The Etisalat Group revealed that it has concluded the transaction of its French-speaking West African Operations to Maroc Telecom. The declaration comes as part of the acquirement of a 53% shareholding in Maroc Telecom that took place in May 2014.
A plan to expand the Rabat tramway line to serve the vicinities of Hay Riyad and Hay El Fath is being confirmed.
|